Electric Motor Repair Case Study - 9000HP Boiler Feed Pump Motor - "In-Shop Findings"

10/24/2016

Boiler_Feed_Pump_Motor.pngBefore Reading - Please see the first article in this Case Study Series: "On-Site Findings."

The results of the "on-site" findings resulted in the determination to pull this Boiler Feed Pump Motor (9000HP, 1800RPM, 13,200v, Siemens Allis) out for repair. The motor was removed and was recieved by the HECO motor repair shop on 3-31-2015.

This is the second article in a series of articles on this Boiler Feed Pump Motor case study. Articles will be released over 3 consecutive weeks. This article focuses on the "in-shop" findings while the motor was at the repair facillity. The first article was based on the "on-site" findings that gave the justifiction required to pull the motor for repair. The third article will show the corrective repairs taken to prevent the failure from recurring.

During the dismantle and inspection process it was quickly confirmed that the unit was extremely dirty. The motor windings were packed full of dirt/debris and the bearings showed signd of rust (water/condensation propagating oxidation). The shaft journals were also marked and damaged from this oxidation with water/moisture. Additionally the inlet air filters were completely plugged - not allowing the motor proper cooling/ventilation.

Inspection/Dismantle Pictures:

Inspection_boiler_feed_pump_motor.png

Inspection_boiler_feed_pump_motor2.png

Inspection_boiler_feed_pump_motor3.pngInspection_boiler_feed_pump_motor4.png

Inspection_boiler_feed_pump_motor5.png

 

Rotor "Focused" Inspection

After cleaning, the rotor was inspected more closley for any issues. Due to the aluminum bronze retaining ring which exists for centrifugal forces, it was not possible to evaluate the shorting ring to bar joint. Therefore, the shorting rings were inductivley heated and removed to inspect the joints. Below is what was found:

Inspection_boiler_feed_pump_motor6.png

Inspection_boiler_feed_pump_motor7.png

Inspection_boiler_feed_pump_motor8.png

Inspection_boiler_feed_pump_motor9.png

Inspection_boiler_feed_pump_motor10.pngInspection_boiler_feed_pump_motor11.png

Inspection_boiler_feed_pump_motor12.png

 

Summary of Inspection Findings

In summary there was strong evidence to conclude this rotor assembly needed to be replaced. There was no way to repair the multiple hair line cracking of the bar to shorting ring. The mechanical integrity of the retaining rings are damaged beyond safe reuse. A new rotor cage was proposed and priced. (I.e. New laminations, bars, shorting rings and retaining rings…. But reusing the old shaft spider assembly).

 

Subscribe to the HECO blog

 

Stay tuned next week as we release the third article on this case study. You will be able to see what repairs that were taken to correct the issues as well as how the motor ran once put back into service. Subscribe to our blog by clicking the link above. Once you subscribe, you will receive an email notification when the additional articles on this case study are released.

 

Bob Bolhuis

HECO - All Systems Go

269-381-7200

bbolhuis@hecoinc.com

 

About the author:

Bob Bolhuis  is a Senior Account Manager for HECO - All Systems Go. Bob has over 25 years of experience in the electric motor industry with a focus on large electric motors. Bob has been instrumental in the implementation of a variety of Motor and Powertrain Performance Systems that HECO has partnered with end-users on. 

Subscribe to Email Updates

Posts by Topic

see all

Recent Posts